Yealink W76P DECT Phone System
Warehouses, workshops and healthcare floors all buy DECT for the same reason: nobody sits at a desk. The IP67 handset is the part that makes this kit survive its first year on site.
| Order quantity | Unit price |
|---|---|
| 1–4 units | $160.16 |
| 5–24 units | $143.00 |
| 25–99 units | $134.42 |
| 100+ units | $125.84 |
Invoice trail and chain-of-custody paperwork with every lot.
Bench-tested and graded to a published standard, not to a guess.
LTL, pallet and small parcel. Cost quoted before you commit.
Order history moves you from prepay to terms. No subscription.
| Manufacturer | Yealink |
|---|---|
| Manufacturer part number | W76P |
| Category | IP Phones & VoIP |
| Condition grade | New |
| Base | W70B, up to 10 handsets / 10 concurrent calls |
| Handset | W56H, 2.4" colour, IP67 |
| Range | Up to 984 ft outdoor / 164 ft indoor |
| Battery | 30 h talk / 400 h standby |
| Charging | Included charger cradle |
| TAA compliance | Compliant variant available — confirmed in writing on quote |
| Minimum order quantity | 5 |
| Lead time | In stock |
| Warranty | 1 yr mfr |
- IP67 rated handset — survives warehouse and yard use
- 30 hours talk time per charge
- Base supports 10 handsets before you add another
Stock items ship from our Cumming, Georgia facility. Orders confirmed before 2:00pm ET on a business day are picked the same day; anything after that moves to the next business morning.
Small parcel goes UPS or FedEx Ground. Anything over 150 lb or more than four cartons moves LTL on a pallet, and freight is quoted before you commit — we do not add it to the invoice afterwards.
Returns on new, unopened stock are accepted within 30 days against an RMA number. Refurbished stock carries a 90-day Nixovan replacement warranty. Full detail is on the shipping and returns pages.
Second reorder on this line. Condition grading has matched the quote both times, which is more than I can say for the last two suppliers I used.
Paperwork arrived with the shipment without me having to chase it. That is the whole reason I moved my sourcing here.
Lead time was quoted at three days and it landed in three days. Freight cost was quoted up front rather than added at invoice.